Did installation get started on Monday as planned?
I think she said tuesday. Still they had three days by now. Should be no problem to wire a whole house in that time at all.
Maybe itās the cables that are failing. You know that one living room camera in the old house was never repaired because there was no cable availableā¦?
Seriously the time that took they could have driven to whatever city in Eastern Europe and bought some cables.
You can call both of them sugar buzzes, eh?
Well I assume some problems there as @Mari is not giving any updates anymoreā¦
Maybe she thinks youāre impatient
Ally enjoys the days out in the sun for so long
Ally was online briefly earlier. If there had been something positive to say, she would definitely have posted something. So letās continue to be patientā¦
Maybe would be an idea to start working instead?
Monday
Which Monday?
11/03/2024 (I really hope that we will solve the problem with the wall)
Mini spoiler, old guests of other projects, three bedrooms, two floors, veranda, three outdoor cameras)
What problem? Maybe I can help with technical advice?
Thank you for your information. Iām very curious to see what it will look like in reality. At least everything sounds very promising.
Canāt wait
@jabbath1987 here you go Ally with be back online tmrw just in case you havenāt all ready heard it
I agree. This is one fresh place, that is for sure.
When I looked at my calendar just now, I realised. Attention, itās Monday, 11.03.24.
Iām just saying!!!
But the day isnāt over yet. And Monday starts later elsewhere too
Attention: joke
Funny that, it always happens once every week where ever you are.
The problem with the stone decoration of the house, the master will come in the morningš„²